Modular Buildings in the Educational Sector
Contents |
[edit] Introduction
Modular buildings are incredibly versatile, meaning that they can be used for several applications, but one of the most popular uses of modular buildings is within the educational sector, specifically as classrooms in schools.
When using a modular building as a classroom, there are a few things that need to be taken into account:
[edit] What will it look like?
When people think of modular buildings, they assume that they are relatively dull structures that aren’t very sturdy and can look like a very unappealing educational environment.
Some of the things that may need to be considered if planning on either installing or having a modular building installed on premises include:
- Making the modular building inviting for everyone.
- Ensuring that it is full of natural light as opposed to artificial lighting.
- Making sure that the building is constructed of the highest quality materials.
[edit] When would be a good time to use it?
One of the reasons why modular buildings are popular is because they are incredibly quick to install compared to a building that is made of bricks and mortar. Modular buildings can be built offsite, meaning that they won’t cause any disruption during busy times at the school or university.
Because of this, the best time to install a modular building on an educational premise is when it is least busy; an example would be during the holiday periods.
Another important thing to remember is to make sure that the correct planning permission has been put in place. If installing a modular building, it must be checked that the necessary paperwork has been sorted prior to installation.
[edit] Other important things to consider
The main issue that people tend to have about modular buildings is that they can be unattractive and an unproductive place to learn. However, another great benefit of modular buildings is that they are very customisable.
For example, if different types of windows are wanted to be situated within the modular building, then the manufacturer can easily change the position of the windows or change the type of window entirely.
It’s also very important to consider the maintenance and foundations of the modular building. They aren’t designed in the same way as an ordinary classroom, so it is important to make sure that they are able to withstand the elements all year round, as well as ensuring that they stay as structurally stable as possible.
[edit] Related articles on Designing Buildings Wiki
- Custom build home.
- Design for Manufacture and Assembly (DfMA).
- HORSA hut.
- Modular buildings.
- Modular classrooms: The Friars Primary School extension.
- Modular construction market report 2020-2026.
- Off-site prefabrication of buildings: A guide to connection choices.
- Open source architectural plans for modular buildings.
- Prefabrication.
- Structure relocation.
- Temporary building.
- Temporary use.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.